EWU's badass red turf and pwnage of Keenan
Posted: Wed Jun 09, 2010 3:08 pm
by Screamin_Eagle174
http://goeags.com/genrel/releases/10atJune9Turfbreaking
Before they can “Play it on the Red,” the old grass surface has to go.
The official start of Eastern Washington University’s Red Turf project will take place with a “turfbreaking” ceremony on Saturday (June 12) at 5 p.m. at Woodward Field on the EWU campus in Cheney, Wash.
On hand will be former Eagle and current Tennessee Titans star Michael Roos, who along with his wife Katherine Roos kick-started the project with a $500,000 pledge. They will join several EWU administrators and others for the ceremonial uncovering of sod. The public is invited to attend, and information regarding contractors, project timelines, a 24-hour web cam and other details will be announced at that time.
I don't know if they had already planned on it, but I passed that idea on to a contact in the dept. a while back. Glad that they're doing it.

Re: Red Turf Prep Starts Sat. June 12
Posted: Wed Jun 09, 2010 3:19 pm
by Willie
Places usually always do the webcam. Even my D-III school has one going.
Re: Red Turf Prep Starts Sat. June 12
Posted: Wed Jun 09, 2010 3:33 pm
by dbackjon
How long of a period will the sod removal take?
Re: Red Turf Prep Starts Sat. June 12
Posted: Wed Jun 09, 2010 3:45 pm
by Screamin_Eagle174
I'm sure they'll announce that info on Saturday; "project timelines, a 24-hour web cam and other details will be announced at that time."
Re: Red Turf Prep Starts Sat. June 12
Posted: Wed Jun 09, 2010 8:41 pm
by MrTitleist
Quick sidenote: How pathetic are you that you'd watch a 24 hour webcam of turf being laid? Is paint drying getting too boring?
(you is you in general, not you specifically.. whomever you are.)
Re: Red Turf Prep Starts Sat. June 12
Posted: Wed Jun 09, 2010 8:50 pm
by Screamin_Eagle174
MrTitleist wrote:Quick sidenote: How pathetic are you that you'd watch a 24 hour webcam of turf being laid? Is paint drying getting too boring?
(you is you in general, not you specifically.. whomever you are.)
I believe the purpose of the 24 hr web cam is that people can view it from wherever on the web on occasion to watch the progress. I doubt there's many if any people out there that pathetic they would watch it 24/7.
Although I think a daily photo blog (one photo a day from the same spot, and maybe a second one featuring a particular process or step) would be cooler, a web cam requires less time/personnel.

Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 6:11 am
by ASUG8
I have to admit I'm curious to see how this turf turns out.......I hope it looks good for EWU/Roos sakes.

Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 8:20 am
by griz8791
I'm not ashamed to admit that I frequently checked in on the installation of MSU's (non-red) turf.
Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 4:04 pm
by polsongrizz
dbackjon wrote:How long of a period will the sod removal take?
I thought "The Red Stain" took about a week, start to finish???

Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 4:23 pm
by Screamin_Eagle174
polsongrizz wrote:dbackjon wrote:How long of a period will the sod removal take?
I thought "The Red Stain" took about a week, start to finish???

Well sometimes shit goes horribly wrong and it can take 9 months, like in your mom's case.

Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 5:42 pm
by polsongrizz
Screamin_Eagle174 wrote:polsongrizz wrote:
I thought "The Red Stain" took about a week, start to finish???

Well sometimes shit goes horribly wrong and it can take 9 months, like in your mom's case.

Not bad but not a home run...I give it *** out of *****.
And BTW my mom loves me, so there...

Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 5:46 pm
by BlackFalkin
The Red turf is gonna be sweet. I think they might dig up the track too and replace it with a black one.

Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 6:02 pm
by Screamin_Eagle174
BlackFalkin wrote:The Red turf is gonna be sweet. I think they might dig up the track too and replace it with a black one.

Take it out and leave it out. But that's probably not gonna happen.

Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 6:22 pm
by BlackFalkin
Screamin_Eagle174 wrote:BlackFalkin wrote:The Red turf is gonna be sweet. I think they might dig up the track too and replace it with a black one.

Take it out and leave it out. But that's probably not gonna happen.

Yea i know, too bad bc it would be perfect. Ditch the track, install the turf, and install a perm visitors side.
Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 7:29 pm
by Screamin_Eagle174
polsongrizz wrote:Screamin_Eagle174 wrote:
Well sometimes shit goes horribly wrong and it can take 9 months, like in your mom's case.

Not bad but not a home run...I give it *** out of *****.
And BTW my mom loves me, so there...

Your mom loves me more.
Apology accepted.
Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 8:39 pm
by ODUsmitty
This is a major undertaking that requires a great amount of coordination.
I did not know there were that many women in that part of Washington, much less that many with their Aunt Flo visiting on June 12th.
Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 10:24 pm
by Grizalltheway
Screamin_Eagle174 wrote:MrTitleist wrote:Quick sidenote: How pathetic are you that you'd watch a 24 hour webcam of turf being laid? Is paint drying getting too boring?
(you is you in general, not you specifically.. whomever you are.)
I believe the purpose of the 24 hr web cam is that people can view it from wherever on the web on occasion to watch the progress.
I doubt there's many if any people out there that pathetic they would watch it 24/7.
Although I think a daily photo blog (one photo a day from the same spot, and maybe a second one featuring a particular process or step) would be cooler, a web cam requires less time/personnel.

I know of one. His name starts with "b" and ends with "n"
Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 10:27 pm
by clenz
Grizalltheway wrote:Screamin_Eagle174 wrote:
I believe the purpose of the 24 hr web cam is that people can view it from wherever on the web on occasion to watch the progress.
I doubt there's many if any people out there that pathetic they would watch it 24/7.
Although I think a daily photo blog (one photo a day from the same spot, and maybe a second one featuring a particular process or step) would be cooler, a web cam requires less time/personnel.

I know of one. His name starts with "b" and ends with "n"

?
Re: Red Turf Prep Starts Sat. June 12
Posted: Thu Jun 10, 2010 10:28 pm
by Grizalltheway
Bingo
Re: Red Turf Prep Starts Sat. June 12
Posted: Fri Jun 11, 2010 9:37 am
by BlackFalkin
Grizalltheway wrote:Bingo
If I were you, Id spend my day thinking about BlackFalkin too.

Re: Red Turf Prep Starts Sat. June 12
Posted: Fri Jun 11, 2010 11:25 am
by Ursus A. Horribilis
BlackFalkin wrote:Grizalltheway wrote:Bingo
If I were you, Id spend my day thinking about BlackFalkin too.


Re: Red Turf Prep Starts Sat. June 12
Posted: Fri Jun 11, 2010 1:38 pm
by Grizalltheway
BlackFalkin wrote:Grizalltheway wrote:Bingo
If I were you, Id spend my day thinking about BlackFalkin too.

Guilty as charged, you sexy bitch.

Re: Red Turf Prep Starts Sat. June 12
Posted: Sat Jun 12, 2010 7:14 pm
by Screamin_Eagle174
Here's a short video I took of the event. Better videos will likely be out later on goeags.com and KREM2's website.
http://sharing.theflip.com/session/57f5 ... o/15070911
As far as sod removal goes, they didn't go into a whole lot of detail, but it'll start on Monday and I'd imagine it wouldn't take more than a couple days or a week tops. According to a handout,
Week of June 14th -- Excavation work and removal of grass field is scheduled to begin. A webcam monitoring the progress of the project will be made available to the public at
http://www.goeags.com.
July-August -- Installation of Red Turf scheduled.
Spet. 3 -- Project is expected to be completed.
We're going with SprintTurf, and so far just over $1,000,000 has been raised. From what I understand, not much more is needed to also get started on the video board, and they hope to get that done this year too. Whether or not that means before or after the season remains to be seen.
Re: Red Turf Prep Starts Sat. June 12
Posted: Sat Jun 12, 2010 8:02 pm
by CatMom
TXST is installing their new turf. FieldTurf DuarSpine PRO. It's only been used by a few teams so far...
Texas State becomes one of the first NCAA or NFL teams to use FieldTurf Duraspine PRO. Texas State joins the New England Patriots, Sacramento State and the University of Arizona as organizations that have opted for the latest in innovation from the world leader in artificial turf
http://www.prweb.com/releases/2010/04/prweb3938794.htm
They started pulling up the old turf this week and there's a time-lapsed video on the athletic site. Kinda funny if you ask me.
http://www.txstatebobcats.com/
And no, the track is staying until after they build the new T&F facility this Fall.
They will also begin the north endzone horseshoe later in the Fall.
Re: Red Turf Prep Starts Sat. June 12
Posted: Sun Jun 13, 2010 12:34 pm
by Screamin_Eagle174
Screamin_Eagle174 wrote:
As far as sod removal goes, they didn't go into a whole lot of detail, but it'll start on Monday and I'd imagine it wouldn't take more than a couple days or a week tops.
Okay, I was way off.
http://goeags.com/genrel/releases/10atJ ... rfbreaking
The excavation and prep work will be performed by Pauletto Trucking and Excavation in Spokane, which was also a sub-contractor for the Sprinturf field that was installed in 2005 at Gonzaga Prep High School in Spokane.
Stephen Pauletto said his company will remove 18 inches of sod and dirt before beginning the prep work, which includes a sophisticated drainage system and 12 inches of granular sand with a coating of gravel. He said that process, including highly-technical laser leveling, will take about eight weeks prior to the installation of the actual turf.
The projected completion date is Sept. 3, with the inaugural game on the red turf taking place Sept. 18 versus Montana, with kickoff scheduled for 4:05 p.m. Pacific time.
A 24-hour web cam is expected to be available for viewing starting Tuesday (June 15), with a link provided at
http://www.goeags.com" onclick="window.open(this.href);return false;. Other contractors involved in the project include Coffman Engineers and Geo Engineers, both based in Spokane, with financing of the project provided by U.S. Bank and approved by the EWU Foundation and EWU Board of Trustees.
More than $1 million has been pledged toward the project, EWU Vice President for University Advancement Mike Westfall said at the “turfbreaking.” Besides Michael and Katherine Roos, other major contributors to the project include a trio of former Eastern students -- Colin Cowherd (now an ESPN national radio/TV broadcaster), Tim Bradbury (a President for American City Business Journals and former EWU football player) and Jim McElwain (now offensive coordinator at Alabama and a former EWU football player and assistant coach) -- as well as the Rockwood Clinic.
In addition, Eastern Hall of Famer Dick Zornes, a former EWU football player, assistant coach, head coach and athletic director, spearheaded the “Play it on the Red” fund-raising effort involving former Eastern players. More than 35 former players have made pledges thus far, as well as another 79 individuals and businesses.